Field Trip Part 2: Tuas Incineration Plant

Some photos and a video from our inside look at TIP

2013-06-27 11.30.13

2013-06-27 11.08.10

A slideshow presentation by an engineer at Tuas Incineration Plant. This slide maps out our four waste-to-energy facilities in Singapore.

2013-06-27 11.09.16

2013-06-27 11.09.52

2013-06-27 11.41.55

A claw crane operator at work.

2013-06-27 11.45.51

Lo hei rubbish! 捞起垃圾!

2013-06-27 11.48.28

2013-06-27 11.55.31

Behind-the-scenes: How the incinerators are monitored.

2013-06-27 11.57.17

Red and green light alerts corresponding to all the different components/stages of the incineration process.

2013-06-27 11.57.35

How the engineers keep track of incineration on their computer monitors.

2013-06-27 12.03.01

A happy engineer!

1052341_10200712944880644_863476374_o (1)

Oh, so THAT’s where my Canadian Pizza 2-For-1 box is… (photo creds to Dan Dan Thio)

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s